These works were carried out through green field sites and existing live carriageways via road closures and diversions. Over 5000m of ducting and cables were installed and along with more than a 1000m of water mains. Due to the constraints of the works, large sections of the excavation required temporary works and were excavated using a vacuum excavator.
Hunter Environmental completed all works before our contract program date with zero reworks.