Scope of Works:
Working closely with the project design team, Hunter Environmental developed and implemented a ground stabilisation strategy to minimize the need for imported fill materials. This approach aligned with the earthworks specification and engineering requirements, delivering both technical and environmental benefits.
These benefits included a 9% cost saving to the enabling package of the project and a reduction in project duration by three weeks. The project cardon emission was also lowered by the reduction in delivery of fill material.